Project Management

Plain-language definitions of every Project Management term that shows up in government contracting work.


Project ManagementAAR

After Action Review (AAR)

An After Action Review is a structured retrospective session where teams systematically evaluate what occurred, what worked, what did not, and what should change to improve future performance.

Read definition
Project ManagementCONOPS

Concept of Operations (CONOPS)

A Concept of Operations (CONOPS) describes how a proposed system or capability will be employed in an operational environment to accomplish a mission, providing the human-centered requirements context for system development.

Read definition
Project ManagementCM

Configuration Management

Configuration Management is the systematic process for controlling changes to a system's functional and physical characteristics throughout its development, production, and operational lifecycle on government contracts.

Read definition
Project ManagementCOOP

Continuity of Operations Plan (COOP)

A Continuity of Operations Plan (COOP) documents how an organization will maintain or resume essential functions during and after a disruption such as a natural disaster, cyber attack, or pandemic.

Read definition
Project ManagementCAP

Corrective Action Plan (CAP)

A Corrective Action Plan is a documented response to audit findings, contract deficiencies, or performance problems that identifies root causes, remediation steps, responsible owners, and completion timelines.

Read definition
Project ManagementCV

Cost Variance

Cost Variance (CV) in Earned Value Management is the difference between the value of work completed and the actual cost incurred, indicating whether a contract is over or under budget.

Read definition
Project ManagementEVM

Earned Value Management (EVM)

Earned Value Management is a project management methodology that integrates cost, schedule, and technical scope to objectively measure contract performance and forecast future costs and completion dates.

Read definition
Project ManagementETC

Estimate to Complete (ETC)

Estimate to Complete (ETC) is the expected cost to finish remaining contract work from a given reporting date, a critical EVM metric used to project whether a program will stay within its budget.

Read definition
Project ManagementIMP

Integrated Master Plan (IMP)

An Integrated Master Plan is an event-driven planning document that defines a program's significant accomplishments, success criteria, and the criteria-based events that govern transition between phases.

Read definition
Project ManagementIMS

Integrated Master Schedule (IMS)

An Integrated Master Schedule is a time-phased, resource-loaded network schedule that captures all program tasks, logic dependencies, and critical path relationships for a government contract.

Read definition
Project ManagementKPP

Key Performance Parameter (KPP)

A Key Performance Parameter (KPP) is a critical threshold performance requirement for a defense system that must be met for the system to be considered operationally effective and suitable.

Read definition
Project ManagementLOE

Level of Effort (LOE)

Level of Effort (LOE) is a contract or work package type defined by the amount of resources applied over time rather than specific deliverables, commonly used for program management and support tasks on government contracts.

Read definition
Project ManagementNTE

Not-to-Exceed (NTE)

A Not-to-Exceed (NTE) ceiling is the maximum amount a contractor may bill or spend on a task or contract, establishing a hard financial limit without committing to paying the full amount if actual costs are lower.

Read definition
Project ManagementPMB

Performance Measurement Baseline (PMB)

The Performance Measurement Baseline is the time-phased budget against which Earned Value Management performance is measured on a government contract, representing the approved plan for completing all contract work.

Read definition
Project ManagementRMF

Risk Management Framework (RMF)

The Risk Management Framework (RMF) is the NIST-based cybersecurity authorization process that federal information systems must complete to receive an Authority to Operate (ATO) for government use.

Read definition
Project Management

Risk Management Plan

A Risk Management Plan documents a program's approach to identifying, analyzing, mitigating, and monitoring risks throughout the contract period of performance on government contracts.

Read definition
Project ManagementROM

Rough Order of Magnitude (ROM)

A Rough Order of Magnitude (ROM) is a high-level cost estimate with an accuracy range of minus 50% to plus 100%, used for preliminary planning and feasibility assessment before detailed requirements are defined.

Read definition
Project ManagementSV

Schedule Variance

Schedule Variance (SV) in Earned Value Management is the difference between the budgeted value of work performed and the budgeted value of work planned, indicating whether a contract is ahead or behind schedule.

Read definition
Project ManagementSOP

Standard Operating Procedure (SOP)

A Standard Operating Procedure (SOP) in government contracting is a documented, step-by-step process that establishes consistent methods for performing recurring tasks in compliance with contract requirements.

Read definition
Project ManagementWBS

Work Breakdown Structure (WBS)

A Work Breakdown Structure is a hierarchical decomposition of a project's total scope into manageable work packages, used in government contracts to organize scheduling, costing, and performance reporting.

Read definition